Water infrastructure
DEPLOYED IN PRODUCED WATER

See the treatment site. Understand the operating record.

XPC monitors unmanned treatment sites between field visits. It connects DAF camera analysis, chemical dosing records, PLC readings and operator entries so the team sees changing conditions and explains the response from one operating record.

Plan a 45-day validation

One operating record

DAF treatment, chemical dosing and unmanned sites

XPC connects dosing and field entries, live equipment readings and camera measurements in one review window. At unmanned sites, threshold alerts bring emerging conditions to the team before the next field visit.

  • FIELD Dosing entry, sample and shift note
  • EQUIPMENT Flow, level, pump state and chemical feed
  • VISUAL Site-specific coverage measurements from an authorized camera
Water operations
Water event review

An event worth reviewing

What happened at this site?

When measured DAF coverage moves above the site baseline, XPC flags the change and aligns the dosing entry, flow trend and before-and-after frames. The operator reviews the response and confirms when the unit returns to band.

The output

Something an operator can stand behind.

XPC produces a reviewed timeline with images, source readings, field entries, data gaps and the operator conclusion. The customer report comes from the same record, without rebuilding the day from spreadsheets and camera archives.

XPC supports monitoring and investigation. Camera measurements do not certify water quality or replace lab work, treatment controls or operator judgment.

XPC WATER · OPERATOR REVIEW

Site event · one time window

01 / Field record
Operator entry and action

02 / Equipment record
Trend and device state

03 / Visual record
Authorized image when useful

04 / Human conclusion
What the team confirmed and what remains unknown

SOURCE LINKED · OPERATOR REVIEWED

45-day validation

One site. One workflow. A decision on day 45.

Choose one unit, one camera and one exception type. Agree on completeness and review time, then evaluate the resulting customer report.

Plan a 45-day validation